Our client wanted to recover out of specification product to maximise production of a high quality product.
A new process design was proposed to deal with a highly hygroscopic protein powder. The design involved reconfiguring existing equipment with new equipment in a confined space within an operational plant. The system had to utilise a loss in weight feeder with a ‘sticky’ powder to try maintain a continuous, consistent process.
The project was completed in a timely manner and resulted in significant financial benefits for the client
Project Value: $1 million
Duration: 6 Months
Project Type:Turnkey (process engineering, equipment, mechanical, electrical, automation and commissioning), managed under Techo’s Safe Work System
Consultant: No consultant
Project Man Hours: 2,000
Key Points:
Outcome:
Delivered safely and on time
Exceeded client expectation