Project Type: Wastewater Treatment


Wastewater pH Correction System

Techo was engaged to develop a system to ensure pH compliance of a 30ML/day waste water stream which experienced extreme pH swings. Because of future waste water treatment requirements, the system was to work with the existing assets and foot print. This was delivered in a full turnkey contract and comprised of:

  • New truck load in bay with bunding
  • Roading upgrade to allow for the 60T chemical tankers
  • 2 new chemical tank bunds
  • A secure potable water supply for 3 safety showers
  • 1 of 60m3 98% Bulk Sulphuric Acid tank in stainless steel
  • 1 of 10m3 Sodium Hydroxide tank in stainless steel
  • 2 of bulk chemical reticulation systems
  • 1 of 1,000m3/hr recirculation loop, chemical dosing nozzles and static mixing
  • Automated pH probe cleaning system
  • Upgrade of existing PLC

Project Value: $5.5 Million

Duration: 12 Months

Project Type: Turn-key delivery of all aspects including civil works, tanks and equipment, mechanical, electrical, automation and commissioning. Health & Safety managed under the clients Safe Work System

Project Man Hours: 10,000

Consultant: N/A

Outcome:

  Delivered safely

  Delivered in budget

  Delivered on time